Emergency no. +49 711 7812 1220
Hazardous Incident Ordinance info. for Sandhaus Gas Storage Facility & Natural Gas Safety Data Sheet
![](/fileadmin/user_upload/Content/Aktuelles/Aktuell-Bilderpool/Unternehmen/Standorte/terranetsbw_Speicher_Sandhausen.jpg)
Hazardous Incident Ordinance info. for Sandhaus Gas Storage Facility & Natural Gas Safety Data Sheet
THE MARKET COMMUNICATION HAS A BREAKDOWN
We actually have failures with market communication processes. Especially the auction and booking processes via the PRISMA platform, nomination and allocation processes and publications are not working properly.
terranets bw will immediately inform about alternations of the situation.
We apologize for any inconvenience caused.
MARKET COMMUNICATION WORKS AGAIN
The market communication is working again.
THE MARKET COMMUNICATION HAS A BREAKDOWN
We actually have failures with market communication processes. Especially the auction and booking processes via the PRISMA platform, nomination and allocation processes and publications are not working properly.
terranets bw will immediately inform about alternations of the situation.
We apologize for any inconvenience caused.
MARKET COMMUNICATION WORKS AGAIN
The market communication is working again.
REDUCTION OF THE CAPACITY AT POINT RC THAYNGEN-FALLENTOR EXIT
The available freely allocable firm exit capacity at point RC Thayngen-Fallentor Exit will be reduced from 01.10.2017 from 437.551 kWh/h to 227.000 kWh/h due to technical necessary pressure reduction.
Furthermore the available freely allocable firm exit capacity at point RC Thayngen-Fallentor Exit will be reduced from 01.04.2018 from 227.000 kWh/h to 0 kWh/h due to technical necessary pressure reduction.
AUCTION BOOKINGS AT THE PRISMA PLATFORM TEMPORARILY NOT (ALWAYS) WORKING
Due to technical problems auction bookings via PRISMA European Capacity Platform are currently not or not completely working at the connection points of terranets bw.
Terranets bw will immediately inform about alternations of the situation.
We apologize for any inconvenience caused
AUCTION BOOKINGS ON THE PRISMA CAPACITY PLATFORM ARE POSSIBLE AGAIN
Auction bookings via the PRISMA European Capacity Platform on connection points of terranets bw are possible again.
NO MONTHLY AUCTIONS OF INTERRUPTIBLE CAPACITY FOR JANUARY 2017 AT CONNECTION POINTS OF TERRANETS BW AVAILABLE
Due to technical problems there are no monthly auctions for January 2017 for interruptible capacity at connection points of terranets bw at the prisma platform available. All transport customers will get informed about an alternative way to book interruptible capacity for the month of January 2016.
We apologize for any inconvenience caused.
SCHEDULED MAINTENANCE WORK AT FRONHOFEN
Work on the Fronhofen connection line will take place between 08.05.2017 from 6 am and 20.05.2017 until 6 am. The storage capacity (into storage/Exit) will be reduced by 50%.
We apologize for any inconvenience caused.
SCHEDULED MAINTENANCE WORK AT FRONHOFEN
Work on the Fronhofen connection line will take place between 04.09.2017 from 6 am and 30.09.2017 until 6 am. The storage capacity (entry and exit) will be reduced by 100%.
We apologize for any inconvenience caused.